Mission
The Engineering Department is tasked with overseeing planning, design and construction of the transportation, drainage, water and  wastewater Capital Improvement Projects (CIP) within the City of Rockwall.  Continual improvement of the City of Rockwall infrastructure is important in moving the City of Rockwall forward.



Atla Vista Dr Reconstruction
N. Lakeshore Drive to Westway Drive
West St Reconstruction
Highland Drive to W. Rusk Street
Project Manager: Jeremy White, P.E., CFM
Current Status: Engineering Design
Project Scope:
  • Roadway Reconstruction (Concrete curb and gutter)
  • Water Line Reconstruction
  • Wastewater Line Reconstruction
  • Storm Drainage Improvements

Ridge Road West Reconstruction
Shores Blvd to N. Goliad St. (SH 205)
Project Manager: Jeremy White, P.E., CFM
Current Status: Engineering Design
Project Scope:
  • Roadway Reconstruction (Concrete curb and gutter)
  • Storm Drainage Improvements

Woodpark Drive Reconstruction
Spring Creek Drive to S. Alamo Road
Lakedale Drive Reconstruction
Lakeview Drive to Ridge Road
S Lakeshore Drive Reconstruction
2000 Block
Project Manager: Jeremy White, P.E., CFM
Current Status: Engineering Design
Project Scope:
  • Roadway Reconstruction (Concrete curb and gutter)
  • Water Line Reconstruction
  • Wastewater Line Reconstruction

Turtle Cove Blvd Reconstruction
Ridge Road to Railroad Tracks
W Yellow Jacket Lane Reconstruction
Ridge Road to Greencrest Blvd
Project Manager: Jeremy White, P.E., CFM
Current Status: Engineering Design
Project Scope:
  • Roadway Reconstruction (Concrete curb and gutter)
  • Water Line Reconstruction
  • Wastewater Line Reconstruction

Highland Drive Reconstruction
Bedford Falls Lane to Valley Drive
Project Manager: Jeremy White, P.E., CFM
Project Scope:
  • Roadway Reconstruction (Concrete curb and gutter)
  • Water Line Reconstruction
  • Wastewater Line Reconstruction
  • Storm Drainage Adjustments
Phase 1 - Bedford Falls Lane Driftwood Street
    Status - Construction Start December 3rd, 2018
Phase 2 - Driftwood Street to Valley Drive
    Status - Engineering Design

Public Meeting held Tuesday, July 17th, 2018, 6pm
(Adjacent Property Owner Meeting)
Public Meeting held Tuesday, August 21st, 2018, 6pm
(Neighborhood Meeting)
September 4th, 2018 City Council Meeting - Approved Proposed Roadway Typical Section and Schematic.

S. Lakeshore Dr./Summit Ridge Dr. Reconstruction
(SH 66 to FM 740)
Project Manager: Jeremy White, P.E., CFM
Current Status: Construction (Start First of 2019)
  • Alley Reconstruction (certain alleys)
  • Drainage System Upgrades
  • Water Line Replacements
  • Wastewater Line Replacements

S. Lakeshore Dr. Reconstruction
Summit Ridge Drive to Tanya Lane
Project Manager: Jeremy White, P.E., CFM
Current Status:Engineering Design
Project Scope:
  • Roadway Reconstruction (Concrete curb and gutter)
  • Water Line Reconstruction
  • Wastewater Line Reconstruction
  • Storm Drainage Improvements


E. Boydstun Ave. Reconstruction
(S. Goliad to Clark St.)
Throckmorton St. Reconstruction
(E. Boydstun Ave. to Bourn St.)
Project Manager: Jeremy White, P.E., CFM
Current Status: Under Construction

  • Roadway reconstruction to concrete curb and gutter
    with 5’ sidewalk on each side.
  • Water Line Replacements
  • Wastewater Line Replacements
  • Construction Plan Set


County Line Road Reconstruction
(FM 3097 to Renee Dr.)
Project Manager: Jeremy White, P.E., CFM
Current Status: Construction (Start First of 2019)
  • Roadway reconstruction to concrete curb and gutter
    with 5’ sidewalk on each side.
  • Drainage System Upgrades
  • Water and Wastewater Adjustments
  • Right-of Way Acquisition will be needed along the corridor.



FM 3549 16" Water Line Relocation
Project Manager: Jeremy White, P.E., CFM
Current Status: Complete
  • Construction Completion – End of December 2017
  • The water line will be relocated, from a point approximately 550ft North of the IH-30 frontage road to a point adjacent to the northern property line of 670 Stodghill Rd (FM 3549), approximately 2800 feet in length and along FM 3549.
  • Water line being relocated due to TxDOT FM 3549 widening project.

Stonebridge Lift Station Elimination & Wastewater Line Replacement
Project Manager: Jeremy White, P.E., CFM
Current Status: Under Construction
  • Construction duration approximately 6 months (Weather Permitting)
  • Construction Plans
  • Eliminating the aging existing wet/well/dry pit lift station by installing a new gravity sanitary sewer main from the existing NTMWD wastewater main to an existing wastewater manhole of S. Lakeshore Drive and Shore view Drive.
  • New services and cleanouts will be installed for the properties served by the new gravity mains.
  • The existing lift station will be decommissioned.

Squabble Creek Lift Station Improvements
Project Manager: Jeremy White, P.E., CFM
Current Status: Under Construction
  • Lift Station Rehab includes replacement of existing pumps, pump starters, electrical room, transformer and generator.
  • Upgrades Piping to accommodate future permanent by-pass pumping unit.
  • Quail Run trunk sewer is 2,225 feet of 30 inch to 36 inch line that will by-pass Quail run lift station.

Quail Run & Memorial Gravity Trunk Sewer
Project Manager: Jeremy White, P.E., CFM
Current Status: Under Construction
  • Quail Run trunk sewer is 2,225 feet of 24 inch to 36 inch wastewater trunk line.
  • Memorial trunk sewer is 3,050 feet of 18 inch wastewater trunk.
  • Trunk sewers will allow for the decommissioning of four (4) wastewater Lift Stations.
  • Construction Plan Set
  • Construction Duration to be 11 months (weather permitting)


 
No projects currently under design or construction.
CIP Interactive Map
CIP Interactive Map